Decision details

prioritised programme for Spending of Commuted Sums for Affordable Housing- 9 Buckingham Road Extension - Design Services

Decision Maker: Chief Executive

Decision status: Recommendations Approved

Is Key decision?: No

Is subject to call in?: No

Purpose:

Background - Cabinet Report 18/2018 sets out the following:
Item 4.1 The Council has considered extending an existing property which it owns. If this is shown to be feasible following further technical work, it is proposed that the funding for this could be top sliced from the £420,000 capital budget prior to the bidding process.
Item 4.3 The target would include any extension of a council owned property authorised prior to the bidding process. Further work would be needed before a budget could be set, but the approximate combined cost of an extension is likely around £115,000 if a 2 storey extension is required.
Feasibility has been carried out using 3 Design options, with the 2nd design option (Both options appended to this document) being decided by the Head of Service for Planning as being the preferred option. To move the project forward the initial cost for the Feasibility Study (£2,500) has been treated as revenue and funded by Property Services but since this project is now moving forward it will capitalised.
Cost estimates derived as part of the Feasibility Study have been compiled and the option 2 extension is costed at circa £176K which includes Build cost (£142K), Preliminaries, OHP, contingency along with Project management costs, Planning

Decision:

Authority to procure Design Services for considered Option 2

Alternative options considered:

Option 1 -
Option 2 -
Option 3 -
No other design services options considered.

Publication date: 12/11/2018

Date of decision: 23/10/2018